{"id":1396,"date":"2018-08-02T14:47:55","date_gmt":"2018-08-02T14:47:55","guid":{"rendered":"https:\/\/mercadoernc.minenergia.cl\/?page_id=1396"},"modified":"2022-01-07T18:46:45","modified_gmt":"2022-01-07T18:46:45","slug":"4-1-current-status-of-projects-under-the-net-billing-law-and-pmgd-projects","status":"publish","type":"page","link":"https:\/\/mercadoernc.minenergia.cl\/?page_id=1396&lang=en","title":{"rendered":"4.1 Current status of projects under the Netbilling Law and PMGD projects"},"content":{"rendered":"<p>[vc_row][vc_column width=\u00bb1\/4&#8243;][vc_tta_accordion active_section=\u00bb1&#8243; collapsible_all=\u00bbtrue\u00bb][vc_tta_section i_icon_fontawesome=\u00bbfa fa-plus\u00bb add_icon=\u00bbtrue\u00bb title=\u00bbAnnexes\u00bb tab_id=\u00bb1641581063072-52630c6f-5618&#8243;][vc_column_text]<\/p>\n<ul>\n<li style=\"text-align: left;\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1387&amp;lang=en\">Annex 1: Regulatory Framework<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1392&amp;lang=en\">Annex 2: Market operation aspects<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1394&amp;lang=en\">Annex 3: Adequacy power<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1395&amp;lang=en\">Annex 4: Distributed Generation<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1401&amp;lang=en\">Annex 5: Information Platforms<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1402&amp;lang=en\">Annex 6: Glossary of Terms<\/a><\/li>\n<li style=\"text-align: left;\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1403&amp;lang=en\">Annex 7: Links to the main laws, regulations and standards<\/a><\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_tta_section][\/vc_tta_accordion][\/vc_column][vc_column width=\u00bb3\/4&#8243;][vc_column_text]<\/p>\n<h1>Annex 4.1 Current status of projects under the Netbilling Law and PMGD projects<\/h1>\n<p>Distributed generation in its various scales has been widely accepted in the Chilean electricity sector, both the generation received under the Netbilling Law and the PMGD have grown substantially since their connection and remuneration were regulated. [\/vc_column_text][vc_tta_accordion active_section=\u00bb33&#8243; collapsible_all=\u00bbtrue\u00bb][vc_tta_section i_icon_fontawesome=\u00bbfa fa-compress\u00bb add_icon=\u00bbtrue\u00bb title=\u00bb4.1.1 Progress in the number of connections and installed capacity of generation projects covered by the Netbilling Law\u00bb tab_id=\u00bbprogress\u00bb][vc_column_text]The Netbilling Law in Chile began to operate effectively from October 2014 so it is a very new regulation. However, already in February of 2015 it had begun the commissioning of the first projects covered by this Law and its increase has not ceased. The requests for connection to the distribution companies started the same month of publication of the regulation. Likewise, the number of registered installations has increased considerably during these years, reaching a total of 6674 installations in the month of December 2020.<\/p>\n<p>Figure 4 shows declarations of commissioning of the projects from the beginning of the validity of the Netbilling Law until December 2020<span style=\"font-size: revert; color: initial;\">.<\/span><\/p>\n<h3 style=\"text-align: center;\"><strong>Figure 4: Installations declared in compliance with the Netbilling Law<\/strong><\/h3>\n<h3 id=\"container\" style=\"width: 100%; height: 400px;\"><\/h3>\n<p style=\"text-align: center;\"><span style=\"color: #999999;\">Source: SEC<\/span><\/p>\n<p>Figure 5 shows the distribution of facilities according to their power range both in quantity and their contribution to the total capacity December 2020.<\/p>\n<h3 style=\"text-align: center;\"><strong>Figure 5: Distributed generation projects by size and contribution of power of each segment&nbsp;<\/strong><\/h3>\n<div class=\"row\">\n<div class=\"col-xs-12 col-md-6\">\n<div id=\"container1\"><\/div>\n<\/div>\n<div class=\"col-xs-12 col-md-6\">\n<div id=\"container2\"><\/div>\n<\/div>\n<\/div>\n<p style=\"text-align: center;\"><span style=\"color: #999999;\">Source: SEC.<\/span><\/p>\n<p>[\/vc_column_text][\/vc_tta_section][vc_tta_section i_icon_fontawesome=\u00bbfa fa-compress\u00bb add_icon=\u00bbtrue\u00bb title=\u00bb4.1.2 PMGD project number progress\u00bb tab_id=\u00bbprogress2&#8243;][vc_column_text]A decade ago there was a significant development of typically hydraulic and diesel PMGD projects, but for 5 years there has been a growing development of wind and solar projects and are projected to continue with this trend. Figure 6 presents the evolution of the number of PMGD projects by technology.<\/p>\n<h3 style=\"text-align: center;\"><strong>Figure 6: Evolution of PMGD projects by technology<\/strong><\/h3>\n<h3 id=\"container3\" style=\"width: 100%; height: 400px;\"><\/h3>\n<p style=\"text-align: center;\"><span style=\"color: #999999;\">Source: SEC.<\/span><\/p>\n<p>[\/vc_column_text][\/vc_tta_section][\/vc_tta_accordion][vc_row_inner][vc_column_inner width=\u00bb1\/2&#8243;][vc_btn title=\u00bbPrevious\u00bb color=\u00bbgreen\u00bb align=\u00bbleft\u00bb i_icon_fontawesome=\u00bbfa fa-chevron-left\u00bb add_icon=\u00bbtrue\u00bb link=\u00bburl:http%3A%2F%2Fmercadoernc.minenergia.cl%2F%3Fpage_id%3D1395%26lang%3Den|||\u00bb][\/vc_column_inner][vc_column_inner width=\u00bb1\/2&#8243;][vc_btn title=\u00bbNext\u00bb color=\u00bbgreen\u00bb align=\u00bbright\u00bb i_icon_fontawesome=\u00bbfa fa-chevron-right\u00bb add_icon=\u00bbtrue\u00bb link=\u00bburl:http%3A%2F%2Fmercadoernc.minenergia.cl%2F%3Fpage_id%3D1397%26lang%3Den|||\u00bb][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=\u00bb1\/4&#8243;][vc_tta_accordion active_section=\u00bb1&#8243; collapsible_all=\u00bbtrue\u00bb][vc_tta_section i_icon_fontawesome=\u00bbfa fa-plus\u00bb add_icon=\u00bbtrue\u00bb title=\u00bbAnnexes\u00bb tab_id=\u00bb1641581063072-52630c6f-5618&#8243;][vc_column_text] Annex 1: Regulatory Framework Annex 2: Market operation aspects Annex 3: Adequacy power Annex 4: Distributed Generation Annex 5: Information Platforms Annex 6: Glossary of Terms Annex 7: Links to the main laws, regulations and standards [\/vc_column_text][\/vc_tta_section][\/vc_tta_accordion][\/vc_column][vc_column width=\u00bb3\/4&#8243;][vc_column_text] Annex 4.1 Current status of projects under the [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":1395,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-1396","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages\/1396","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1396"}],"version-history":[{"count":21,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages\/1396\/revisions"}],"predecessor-version":[{"id":4372,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages\/1396\/revisions\/4372"}],"up":[{"embeddable":true,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages\/1395"}],"wp:attachment":[{"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1396"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}