{"id":1381,"date":"2018-08-01T20:57:22","date_gmt":"2018-08-01T20:57:22","guid":{"rendered":"https:\/\/mercadoernc.minenergia.cl\/?page_id=1381"},"modified":"2021-12-01T17:22:12","modified_gmt":"2021-12-01T17:22:12","slug":"6-commercial-operation-in-the-market","status":"publish","type":"page","link":"https:\/\/mercadoernc.minenergia.cl\/?page_id=1381&lang=en","title":{"rendered":"6. Commercial operation in the market"},"content":{"rendered":"<p>[vc_row][vc_column width=\u00bb1\/4&#8243;][vc_tta_accordion active_section=\u00bb1&#8243; collapsible_all=\u00bbtrue\u00bb][vc_tta_section i_icon_fontawesome=\u00bbfa fa-plus\u00bb add_icon=\u00bbtrue\u00bb title=\u00bbCommercial Operation\u00bb tab_id=\u00bb1638378722368-4842a88c-03f1&#8243;][vc_column_text]<\/p>\n<ul>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1381&amp;lang=en\" rel=\"noopener\">6. Commercial operation in the market<\/a><\/span><\/span><\/li>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1382&amp;lang=en\" rel=\"noopener\">6.1. Overview of marketing alternatives<\/a><\/span><\/span><\/li>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1383&amp;lang=en\" rel=\"noopener\">6.2. Commercialization Alternatives<\/a><\/span><\/span><\/li>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1384&amp;lang=en\" rel=\"noopener\">6.3. Payment for use of networks<\/a><\/span><\/span><\/li>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1385&amp;lang=en\" rel=\"noopener\">6.4. Exemption of charges<\/a><\/span><\/span><\/li>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1386&amp;lang=en\" rel=\"noopener\">6.5. Ancillary services and NCRE<\/a><\/span><\/span><\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_tta_section][\/vc_tta_accordion][\/vc_column][vc_column width=\u00bb3\/4&#8243;][vc_single_image image=\u00bb2037&#8243; img_size=\u00bbfull\u00bb alignment=\u00bbcenter\u00bb style=\u00bbvc_box_rounded\u00bb][vc_column_text]<\/p>\n<h1>6. Commercial operation in the market<\/h1>\n<p>The market operation of a NCRE project is regulated by the general rules applicable to any generator, described previously in chapter 3. Based on this general description, the different commercial alternatives for a NCRE project are now set out in greater detail.<\/p>\n<p>The technical aspects of the operation in an electric market are covered by the regulations and technical standards of the respective segments. In the case of transmission systems, the NTSyCS defines the operation and measurement requirements of the generating units. At medium voltage levels, the NTCO of PMGD focuses on the operational and coordination aspects of PMGDs.<\/p>\n<p>Figure 31 shows a schematic diagram related to the elements considered in the market operation. In the first place, the different alternatives of participation are presented, among which the three basic ones stand out: \u00about of the market\u00bb, spot market and contract market. There are other alternatives that are, in broad outlines, a combination of the aforementioned alternatives. As for the \u00aboff-market\u00bb alternative, this refers to the direct (and private) negotiation between a small NCRE generator and the distribution company, without being directly part of a more formal market, such as the spot market or one of contracts.<\/p>\n<p>The second stage shows elements of market share, among which the payment for the use of the network (charges) and ancillary services (SSCC) stand out.<\/p>\n<p>Finally, reference is made to other elements to be considered in the market operation of a project, such as NCRE generation quotas (established in Law 20.257 and Law 20.698).<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-3800 \" src=\"https:\/\/mercadoernc.minenergia.cl\/wp-content\/uploads\/2021\/10\/Figure-31.png\" alt=\"\" width=\"535\" height=\"514\" srcset=\"https:\/\/mercadoernc.minenergia.cl\/wp-content\/uploads\/2021\/10\/Figure-31.png 893w, https:\/\/mercadoernc.minenergia.cl\/wp-content\/uploads\/2021\/10\/Figure-31-300x288.png 300w, https:\/\/mercadoernc.minenergia.cl\/wp-content\/uploads\/2021\/10\/Figure-31-768x737.png 768w, https:\/\/mercadoernc.minenergia.cl\/wp-content\/uploads\/2021\/10\/Figure-31-660x633.png 660w\" sizes=\"auto, (max-width: 535px) 100vw, 535px\" \/><\/p>\n<p>[\/vc_column_text][vc_row_inner][vc_column_inner width=\u00bb1\/2&#8243;][vc_btn title=\u00bbPrevious\u00bb color=\u00bbgreen\u00bb align=\u00bbleft\u00bb i_icon_fontawesome=\u00bbfa fa-chevron-left\u00bb add_icon=\u00bbtrue\u00bb link=\u00bburl:https%3A%2F%2Fmercadoernc.minenergia.cl%2F%3Fpage_id%3D1380%26lang%3Den|||\u00bb][\/vc_column_inner][vc_column_inner width=\u00bb1\/2&#8243;][vc_btn title=\u00bbNext\u00bb color=\u00bbgreen\u00bb align=\u00bbright\u00bb i_icon_fontawesome=\u00bbfa fa-chevron-right\u00bb add_icon=\u00bbtrue\u00bb link=\u00bburl:https%3A%2F%2Fmercadoernc.minenergia.cl%2F%3Fpage_id%3D1382%26lang%3Den|||\u00bb][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=\u00bb1\/4&#8243;][vc_tta_accordion active_section=\u00bb1&#8243; collapsible_all=\u00bbtrue\u00bb][vc_tta_section i_icon_fontawesome=\u00bbfa fa-plus\u00bb add_icon=\u00bbtrue\u00bb title=\u00bbCommercial Operation\u00bb tab_id=\u00bb1638378722368-4842a88c-03f1&#8243;][vc_column_text] 6. Commercial operation in the market 6.1. Overview of marketing alternatives 6.2. Commercialization Alternatives 6.3. Payment for use of networks 6.4. Exemption of charges 6.5. Ancillary services and NCRE [\/vc_column_text][\/vc_tta_section][\/vc_tta_accordion][\/vc_column][vc_column width=\u00bb3\/4&#8243;][vc_single_image image=\u00bb2037&#8243; img_size=\u00bbfull\u00bb alignment=\u00bbcenter\u00bb style=\u00bbvc_box_rounded\u00bb][vc_column_text] 6. Commercial operation in the market The market operation of [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-1381","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages\/1381","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1381"}],"version-history":[{"count":7,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages\/1381\/revisions"}],"predecessor-version":[{"id":4242,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages\/1381\/revisions\/4242"}],"wp:attachment":[{"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1381"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}