{"id":1377,"date":"2018-08-01T20:12:53","date_gmt":"2018-08-01T20:12:53","guid":{"rendered":"https:\/\/mercadoernc.minenergia.cl\/?page_id=1377"},"modified":"2021-12-01T15:44:17","modified_gmt":"2021-12-01T15:44:17","slug":"5-integration-into-the-ncre-market","status":"publish","type":"page","link":"https:\/\/mercadoernc.minenergia.cl\/?page_id=1377&lang=en","title":{"rendered":"5. Integration into the NCRE market"},"content":{"rendered":"<p>[vc_row][vc_column width=\u00bb1\/4&#8243;][vc_tta_accordion active_section=\u00bb1&#8243; collapsible_all=\u00bbtrue\u00bb][vc_tta_section i_icon_fontawesome=\u00bbfa fa-plus\u00bb add_icon=\u00bbtrue\u00bb title=\u00bbNCRE Integration\u00bb tab_id=\u00bb1638373283450-0b65534c-a320&#8243;][vc_column_text]<\/p>\n<ul>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1377&amp;lang=en\" rel=\"noopener\">5. Integration into the NCRE market<\/a><\/span><\/span><\/li>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1378&amp;lang=en\" rel=\"noopener\">5.1. Integration alternatives to an electric system<\/a><\/span><\/span><\/li>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1379&amp;lang=en\" rel=\"noopener\">5.2. Processing of technical permits<\/a><\/span><\/span><\/li>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1380&amp;lang=en\" rel=\"noopener\">5.3. Connection costs<\/a><\/span><\/span><\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_tta_section][\/vc_tta_accordion][\/vc_column][vc_column width=\u00bb3\/4&#8243;][vc_single_image image=\u00bb2036&#8243; img_size=\u00bbfull\u00bb alignment=\u00bbcenter\u00bb style=\u00bbvc_box_rounded\u00bb][vc_column_text]<\/p>\n<h1>5. Integration into the NCRE market<\/h1>\n<p>This chapter deals with the issue of integrating NCRE into the market. It is important to note that the topics covered in this section are primarily technical issues. Initially, the different integration alternatives available for participating in the market will be described. The legal provisions in force, the obligations of participating in the market, eventual preferential arrangements and their justifications will be considered. These alternatives also refer to the level of voltage in the network (distribution with voltages lower or equal to 23 kV, sub-transmission or transmission with voltages greater than 23 kV) or to development poles, to arrange the connection of a NCRE project. Once the project connection location is identified, the necessary procedures to allow for the operation of a NCRE generator are described. Finally, connection costs are discussed. These also depend on connection location, as occurs with the associated procedures and technical regulations.<\/p>\n<p>Figure 28 shows the corresponding stages considered in the NCRE market integration process, these stages are described in detail in the following sections of this chapter.<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-3795 \" src=\"https:\/\/mercadoernc.minenergia.cl\/wp-content\/uploads\/2021\/10\/Figure-28.png\" alt=\"\" width=\"597\" height=\"409\" srcset=\"https:\/\/mercadoernc.minenergia.cl\/wp-content\/uploads\/2021\/10\/Figure-28.png 996w, https:\/\/mercadoernc.minenergia.cl\/wp-content\/uploads\/2021\/10\/Figure-28-300x205.png 300w, https:\/\/mercadoernc.minenergia.cl\/wp-content\/uploads\/2021\/10\/Figure-28-768x526.png 768w, https:\/\/mercadoernc.minenergia.cl\/wp-content\/uploads\/2021\/10\/Figure-28-660x452.png 660w\" sizes=\"auto, (max-width: 597px) 100vw, 597px\" \/><\/p>\n<p>[\/vc_column_text][vc_row_inner][vc_column_inner width=\u00bb1\/2&#8243;][vc_btn title=\u00bbPrevious\u00bb color=\u00bbgreen\u00bb align=\u00bbleft\u00bb i_icon_fontawesome=\u00bbfa fa-chevron-left\u00bb add_icon=\u00bbtrue\u00bb link=\u00bburl:https%3A%2F%2Fmercadoernc.minenergia.cl%2F%3Fpage_id%3D1376%26lang%3Den|||\u00bb][\/vc_column_inner][vc_column_inner width=\u00bb1\/2&#8243;][vc_btn title=\u00bbNext\u00bb color=\u00bbgreen\u00bb align=\u00bbright\u00bb i_icon_fontawesome=\u00bbfa fa-chevron-right\u00bb add_icon=\u00bbtrue\u00bb link=\u00bburl:https%3A%2F%2Fmercadoernc.minenergia.cl%2F%3Fpage_id%3D1378%26lang%3Den|||\u00bb][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=\u00bb1\/4&#8243;][vc_tta_accordion active_section=\u00bb1&#8243; collapsible_all=\u00bbtrue\u00bb][vc_tta_section i_icon_fontawesome=\u00bbfa fa-plus\u00bb add_icon=\u00bbtrue\u00bb title=\u00bbNCRE Integration\u00bb tab_id=\u00bb1638373283450-0b65534c-a320&#8243;][vc_column_text] 5. Integration into the NCRE market 5.1. Integration alternatives to an electric system 5.2. Processing of technical permits 5.3. Connection costs [\/vc_column_text][\/vc_tta_section][\/vc_tta_accordion][\/vc_column][vc_column width=\u00bb3\/4&#8243;][vc_single_image image=\u00bb2036&#8243; img_size=\u00bbfull\u00bb alignment=\u00bbcenter\u00bb style=\u00bbvc_box_rounded\u00bb][vc_column_text] 5. Integration into the NCRE market This chapter deals with the issue of integrating NCRE into the market. [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-1377","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages\/1377","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1377"}],"version-history":[{"count":7,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages\/1377\/revisions"}],"predecessor-version":[{"id":4238,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages\/1377\/revisions\/4238"}],"wp:attachment":[{"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1377"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}