{"id":1375,"date":"2018-08-01T20:03:01","date_gmt":"2018-08-01T20:03:01","guid":{"rendered":"https:\/\/mercadoernc.minenergia.cl\/?page_id=1375"},"modified":"2022-01-07T17:13:21","modified_gmt":"2022-01-07T17:13:21","slug":"4-7-minimum-technical-requirements-for-ncre-projects","status":"publish","type":"page","link":"https:\/\/mercadoernc.minenergia.cl\/?page_id=1375&lang=en","title":{"rendered":"4.7. Minimum technical requirements for NCRE projects contained in the NTSyCS"},"content":{"rendered":"<p>[vc_row][vc_column width=\u00bb1\/4&#8243;][vc_tta_accordion active_section=\u00bb1&#8243; collapsible_all=\u00bbtrue\u00bb][vc_tta_section i_icon_fontawesome=\u00bbfa fa-plus\u00bb add_icon=\u00bbtrue\u00bb title=\u00bbNCRE in Chile\u00bb tab_id=\u00bb1638373165876-e72c8bfc-0593&#8243;][vc_column_text]<\/p>\n<ul>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1368&amp;lang=en\" rel=\"noopener\">4. The NCRE in the Chilean electricity market<\/a><\/span><\/span><\/li>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1369&amp;lang=en\" rel=\"noopener\">4.1. General context<\/a><\/span><\/span><\/li>\n<li><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1371&amp;lang=en\" rel=\"noopener\">4.2. Definition of means of NCRE generation<\/a><\/span><\/span><\/li>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1370&amp;lang=en\" rel=\"noopener\">4.3. Overview of stages of project development<\/a><\/span><\/span><span class=\"outer\"><span class=\"inner\"><br \/>\n<\/span><\/span><\/li>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1372&amp;lang=en\" rel=\"noopener\">4.4. Regulatory framework<\/a><\/span><\/span><\/li>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1373&amp;lang=en\" rel=\"noopener\">4.5. NCRE Law<\/a><\/span><\/span><span class=\"outer\"><span class=\"inner\"><br \/>\n<\/span><\/span><\/li>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1374&amp;lang=en\" rel=\"noopener\">4.6. Recognition of adequacy power<\/a><\/span><\/span><\/li>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1375&amp;lang=en\" rel=\"noopener\">4.7. Minimum technical requirements<\/a><\/span><\/span><\/li>\n<li style=\"text-align: left;\"><span class=\"outer\"><span class=\"inner\"><a href=\"https:\/\/mercadoernc.minenergia.cl\/?page_id=1376&amp;lang=en\" rel=\"noopener\">4.8. Information and resources<\/a><\/span><\/span><\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_tta_section][\/vc_tta_accordion][\/vc_column][vc_column width=\u00bb3\/4&#8243;][vc_column_text]<\/p>\n<h1>4.7. Minimum technical requirements for NCRE projects contained in the NTSyCS<\/h1>\n<p>The technical regulation applicable to the connection and operation of the NCRE generator differs according to the selected connection system, as discussed in section 5.2 of the book, which delves into the requirements for a PMGD. In this chapter, we present the most relevant articles of the Technical Standard for Security and Quality of Service (NTSyCS)<span class=\"tooltips \" style=\"\" title=\"Source: &lt;a href=&quot;https:\/\/www.cne.cl\/wp-content\/uploads\/2020\/01\/NTSyCS-Dic2019.pdf&quot; target=&quot;_blank&quot; rel=&quot;noopener&quot;&gt;Technical standard updated to December 2019&lt;\/a&gt;. CNE\"><span style=\"color: #3366ff; cursor: pointer;\">[29]<\/span><\/span> that refer to the technical requirements of connection and operation in the interconnected systems of NCRE projects. It is emphasized that the NTSyCS defines the technical requirements applicable to all generation units whose level of connection to the electric system exceeds 23 kV <span class=\"tooltips \" style=\"\" title=\"Note: While the PMGDs are coordinated by the Coordinator, the NTSyCS would be applicable to them in relation to requests for information. The coordination of its operation focuses on the respective distribution company according to the &lt;a href=&quot;https:\/\/www.cne.cl\/wp-content\/uploads\/2019\/07\/NTCO-PMGD-Julio-2019.pdf&quot; target=&quot;_blank&quot; rel=&quot;noopener&quot;&gt;Technical Standard for Connection and Operation of Small Generation Distributed at Medium Voltage (NTCO&lt;\/a&gt;).\"><strong><em><span style=\"color: #3366ff; cursor: pointer;\">15<\/span><\/em><\/strong><\/span>, and that there are certain provisions that specifically apply to NCRE technologies, especially wind and solar generation. Moreover, it imposes requirements for its participation in frequency control and voltage control.<\/p>\n<p>The installations and equipment of generators that operate interconnected in the national electric system must comply with certain requirements indicated in the NTCySC. Table 7 summarizes those provisions and the corresponding articles of the NTSyCS applicable to NCRE projects.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-3793\" src=\"https:\/\/mercadoernc.minenergia.cl\/wp-content\/uploads\/2021\/10\/Table-7-T.png\" alt=\"\" width=\"794\" height=\"626\" srcset=\"https:\/\/mercadoernc.minenergia.cl\/wp-content\/uploads\/2021\/10\/Table-7-T.png 1390w, https:\/\/mercadoernc.minenergia.cl\/wp-content\/uploads\/2021\/10\/Table-7-T-300x237.png 300w, https:\/\/mercadoernc.minenergia.cl\/wp-content\/uploads\/2021\/10\/Table-7-T-1024x807.png 1024w, https:\/\/mercadoernc.minenergia.cl\/wp-content\/uploads\/2021\/10\/Table-7-T-768x606.png 768w, https:\/\/mercadoernc.minenergia.cl\/wp-content\/uploads\/2021\/10\/Table-7-T-660x520.png 660w\" sizes=\"auto, (max-width: 794px) 100vw, 794px\" \/>[\/vc_column_text][vc_row_inner][vc_column_inner width=\u00bb1\/2&#8243;][vc_btn title=\u00bbPrevious\u00bb color=\u00bbgreen\u00bb align=\u00bbleft\u00bb i_icon_fontawesome=\u00bbfa fa-chevron-left\u00bb add_icon=\u00bbtrue\u00bb link=\u00bburl:https%3A%2F%2Fmercadoernc.minenergia.cl%2F%3Fpage_id%3D1374%26lang%3Den|||\u00bb][\/vc_column_inner][vc_column_inner width=\u00bb1\/2&#8243;][vc_btn title=\u00bbNext\u00bb color=\u00bbgreen\u00bb align=\u00bbright\u00bb i_icon_fontawesome=\u00bbfa fa-chevron-right\u00bb add_icon=\u00bbtrue\u00bb link=\u00bburl:https%3A%2F%2Fmercadoernc.minenergia.cl%2F%3Fpage_id%3D1376%26lang%3Den|||\u00bb][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column width=\u00bb1\/4&#8243;][vc_tta_accordion active_section=\u00bb1&#8243; collapsible_all=\u00bbtrue\u00bb][vc_tta_section i_icon_fontawesome=\u00bbfa fa-plus\u00bb add_icon=\u00bbtrue\u00bb title=\u00bbNCRE in Chile\u00bb tab_id=\u00bb1638373165876-e72c8bfc-0593&#8243;][vc_column_text] 4. The NCRE in the Chilean electricity market 4.1. General context 4.2. Definition of means of NCRE generation 4.3. Overview of stages of project development 4.4. Regulatory framework 4.5. NCRE Law 4.6. Recognition of adequacy power 4.7. Minimum technical requirements 4.8. Information and resources [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":1368,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-1375","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages\/1375","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1375"}],"version-history":[{"count":11,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages\/1375\/revisions"}],"predecessor-version":[{"id":4355,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages\/1375\/revisions\/4355"}],"up":[{"embeddable":true,"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=\/wp\/v2\/pages\/1368"}],"wp:attachment":[{"href":"https:\/\/mercadoernc.minenergia.cl\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1375"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}